CNC turning
Shafts, pins and turn-milled parts with threads, grooves and keyways.
Learn more ›Your manufacturing partner in China · since 2016
CNC turning and milling, plastic injection moulding, die casting, sintered and MIM parts to your drawing – made in six specialised factories in which Schutawill holds a stake. Managed by a team in Shenzhen that speaks German and English.

Design example SW-RH5 · We don’t build robots – we make every one of their 111 parts. · Parts for robotics ›
Real series parts from our factories – original photos
Parts gallery ›A look inside the factories
Original footage from the Schutawill company video, no sound. All photos from the factories ›
Also via partner factories: Stamping & deep drawing · Sheet metal fabrication · Forging · Parts for robotics ›
Choosing a process
The choice depends mainly on three factors: material, quantity and geometry. CNC turning and milling need no tooling and pay off from a single part up to a few thousand pieces. Injection moulding, die casting, sintering and MIM require a tool, but in return lower the unit price significantly from about 1,000 to 10,000 parts.
Process finder
Three questions – a first recommendation. You receive the binding assessment with the quote.
Recommendation
CNC milling
We mill prismatic aluminium parts in small to medium quantities directly from solid stock, without tooling costs.
Alternative from about 1,000 pieces: die casting with CNC finishing of the functional faces.
Request with this recommendation ›Typical guide values from practice. What applies to your part, we check in the quote based on the drawing.
| processes | Typical materials | Tooling required | Economical from | Typical tolerance | Typical parts |
|---|---|---|---|---|---|
| CNC turning | Steel, stainless steel, aluminium, brass, plastics | No | 1 piece | ± 0.01 – 0.05 mm | Shafts, bushings, pins, connectors |
| CNC milling | Aluminium, steel, stainless steel, plastics | No | 1 piece | ± 0.01 – 0.05 mm | Housings, plates, brackets, hydraulic blocks |
| Plastic injection moulding | PA, PA-GF, PC, PC/ABS, POM, PP, TPE | Yes, injection mould | approx. 1,000 pieces | ± 0.05 – 0.2 mm, depending on size and material | Housings, covers, clips, grips |
| Die casting | Aluminium (e.g. AlSi9Cu3, AlSi10Mg), zinc (Zamak) | Yes, die-casting die | approx. 1,000 pieces | Casting tolerance to DIN EN ISO 8062; functional faces CNC-finished | Housings, covers, brackets with ribs |
| Sintered parts (PM) | Sintered steel (Fe-Cu-C), sintered bronze | Yes, press tool | approx. 5,000 pieces | ± 0.05 – 0.1 mm, coarser in pressing direction | Gears, plain bearings, cams, flanges |
| MIM | 17-4PH, 316L, low-alloy steels | Yes, injection mould | approx. 5,000 – 10,000 pieces | ± 0.3 – 0.5 % of nominal size | small, complex metal parts under 100 g |
Interactive · robotic hand SW-RH5
111 parts, six processes, zero collisions. Load-bearing finger links made by MIM, white shells injection-moulded, pinions sintered, pins turned, palm milled, forearm die-cast. Click a part to see its process and material – and request it directly.
Drag to rotate · scroll to zoom · click for part info
Gestures
Joints
View
Filter by process
| Part | processes | Material | Qty |
|---|---|---|---|
| Palm | CNC milling | EN AW-7075, black anodised | 1 |
| Proximal phalanx | MIM | 17-4PH, PVD anthracite | 5 |
| Middle phalanx | MIM | 17-4PH, PVD anthracite | 5 |
| Distal phalanx | MIM | 17-4PH, PVD anthracite | 5 |
| Finger shell, proximal phalanx | Injection moulding | PC/ABS white, matt | 10 |
| Finger shell, middle phalanx | Injection moulding | PC/ABS white, matt | 10 |
| Fingertip (overmoulded) | Injection moulding | PC/ABS white, overmoulded | 5 |
| Fingertip pad | Injection moulding | TPE Shore 60A | 5 |
| Coupling rod | MIM | 17-4PH | 10 |
| Joint pin Ø3 | CNC turning | 1.4305, Ø 3 h7 | 15 |
| Coupling pin Ø2 | CNC turning | 1.4305, Ø 2 h7 | 20 |
| Drive pinion | Sintered parts | Sintered steel Fe-Cu-C | 5 |
| Pinion shaft | CNC turning | 1.4305, Ø 3 | 5 |
| Back-of-hand shell | Injection moulding | PC/ABS white, matt | 1 |
| Palm pad | Injection moulding | TPE Shore 50A | 1 |
| Thumb carrier | Die casting | Zinc ZP0410 (Zamak 5), white powder-coated | 1 |
| Thumb axis | CNC turning | 1.4305, Ø 4 | 1 |
| Wrist shaft | CNC turning | 42CrMo4, Ø 12 | 1 |
| Wrist bearing ring | CNC turning | EN AW-6082, black anodised | 1 |
| Forearm shell | Die casting | AlSi10Mg, white powder-coated | 1 |
| End cap | Injection moulding | PA6-GF30 | 1 |
| Plain bearing bushing | Sintered parts | Sintered bronze CuSn10, oil-impregnated | 2 |
Design example, not a series product. Actuators and electronics are not part of the model – only parts that Schutawill can manufacture are shown. Collision check (BRep intersection volume of all part pairs) in nine poses – open, fist, fist with wrist 90°, pinch grip, pointing, peace, rock, gripping, thumb fully flexed: 0 interferences. Workpiece grip determined adaptively: each finger bends until it touches the turned sleeve Ø32 (index 60°, middle 70°, ring 60°, little finger 55°, thumb 14° at 50° opposition) – remaining gap under 1 mm, no interference.
Second design exampleOne pump. Six processes.Take the gear pump SW-GP12 apart in 3D – each part with process, material and reasoning. View ›Process
Upload your drawing (STEP or PDF), quantity and target date. On request we sign a non-disclosure agreement beforehand.
Step 01 of 05 · changes automatically, click to pause
Quality
Series release only after your confirmation.
Our team inspects on site – not only at your goods receipt.
Material certificates and third-party inspection reports on request.
The factories for plastic injection moulding and die casting are ISO-certified.
Sourcing from China
“Will the quality be right?”
Samples first, then series.
You receive first articles with a measurement report and release them. Before every shipment we inspect the series at the factory.
“Will they understand me?”
German or English – directly with the team.
No call centre, no middleman: your contact person works in Shenzhen, close to the factories.
“Is my drawing safe?”
NDA first, data to one factory only.
On request we sign before the first exchange. Your documents only go to the factory that makes your part.
“Who is liable if something goes wrong?”
One contract. One responsibility.
You order from Schutawill – not from six factories. We manage production and stand for the result.
“Will it arrive on time?”
Status reports instead of silence.
Regular updates during the series, documentation and shipping under the agreed Incoterms.
Company
Your contractual partner is a company registered in Hong Kong. Project management is based in Shenzhen – close to the factories.
旭泰威工業聯合集團有限公司
Rm D5, 5/F, King Yip Factory Building
No. 59 King Yip Street, Kwun Tong
Kowloon, Hong Kong
CR No. 2429920 · founded 2016
深圳市旭泰威科技有限公司
Room 101, Building 3, Jinshunlai Industrial Park
No. 10 Dazhi Road, Longgang District
Shenzhen 518172, China
USCC 91440300MA5DQWRX9X
Managing director · your contact for projects from Europe
Schutawill manufactures metal and plastic parts to customer drawings in China for companies in Europe. Schutawill Industrial Federation Group Limited (Hong Kong, founded 2016) holds stakes in six specialised factories for CNC turning, CNC milling, injection moulding, die casting, sintered parts and MIM; a team in Shenzhen manages projects in German and English.
Mainly material, quantity and geometry decide. CNC turning and milling need no tooling and pay off from a single part up to a few thousand pieces. Injection moulding and die casting typically become economical from about 1,000 parts per year, sintered parts and MIM from about 5,000 to 10,000 parts. The process finder on this page gives a first recommendation.
STEP/STP, IGES, DXF and DWG as well as PDF drawings with tolerances. Without a 3D model, a dimensioned drawing or a sample part is enough for a first assessment.
Usually within 24 hours, for complex parts within 72 hours. For parts with a new tool the review can take a little longer – you then first receive feedback on feasibility.
A sample order before series production is possible. As a guide for series: turned and milled parts from about 100 pieces, die casting and injection moulding from about 500 pieces depending on the part. For smaller quantities, just ask.
It depends on the process. Turned and milled samples are usually ready in 3 to 10 days. For parts that need a tool (injection moulding, die casting, sintering, MIM), tool making and first articles usually take 25 to 35 days. We confirm the series date in the quote.
In three stages: first articles with a measurement report for your approval, in-process and final inspections by our team on site before every shipment, and material certificates and third-party inspection reports on request.
Schutawill holds stakes in six specialised factories: CNC turning, CNC milling, plastic injection moulding, die casting, sintered parts and metal injection moulding (MIM). Further processes such as investment casting or stamped parts are offered via selected partner factories.
Schutawill Industrial Federation Group Limited, registered in Hong Kong (CR No. 2429920). Project management is handled by Shenzhen Schutawill Technology Co., Ltd. (USCC 91440300MA5DQWRX9X).
Yes. Drawings are only passed on to the factory selected for your part. On request we sign a non-disclosure agreement (NDA) beforehand.
SW-RH5 is Schutawill’s own design example, not a series product. The hand consists of 111 parts in 22 positions, all of which can be made with the six Schutawill processes: 43 turned parts, 33 injection-moulded parts, 25 MIM parts, 7 sintered parts, 2 die-cast parts and one milled palm. A collision check in nine poses found zero interferences.
Free guide · PDF, 9 pages, German
Six DFM rules each for CNC turning, CNC milling, injection moulding, die casting, sintered parts and MIM – with typical tolerances, surfaces and cost drivers. To print and keep next to your screen.
Download PDF no sign-up
Company presentation · PDF, 13 pages
Six processes, tool making, quality control and workflow – with photos from our factories. Easy to forward to purchasing and engineering.
Download PDF (4.5 MB)German version (4.5 MB)Upload your file – we usually reply within 24 hours (up to 72 hours for complex parts) with feasibility, price and lead time.
STEP · STP · IGES · DXF · DWG · PDF
Confidentiality (NDA) on request before the first exchange.