Home›Guides›Manufacturing parts in China: process, costs, risks

Guides

Manufacturing parts in China: process, costs, risks

Schutawill editorial team · updated 22 Nov 2026

Short answer: Manufacturing parts in China pays off above all for castings, injection-moulded parts and medium to large series, where tooling and unit costs are well below European levels. Success depends on a complete drawing, an approved first article with a measurement report and an inspection before shipment – not on the lowest quoted price.

Which parts are worth making in China?

Well suited Less suited
Die casting, investment casting, sand casting Very urgent one-off parts
Plastic injection moulding including mould making Parts with frequent design changes
Turned and milled parts from medium quantities Parts where freight exceeds the part price
Stamped and sheet metal parts, forgings Projects without drawing or specification
Assemblies combining several processes Safety-critical parts without an inspection concept

Rule of thumb: the higher the share of tooling and labour in the part price, the greater the advantage. The more urgent and smaller the order, the smaller it is.

The process in 7 steps

  1. Request with complete documents. 3D model (STEP) plus 2D drawing (PDF) with tolerances, material, finish, quantity per call-off and per year.
  2. Feasibility and quote. The supplier checks manufacturability (DFM) and states process, tooling cost, unit price, lead time and Incoterms.
  3. Tool making (for casting, injection moulding, stamping). Clarify in writing beforehand who owns the tool and whether it can be released.
  4. First articles with an inspection report. Samples from the series tool, measured against your drawing (see first article inspection report).
  5. Approval and series. The series only starts after your written approval – with the same materials and processes as the samples.
  6. Pre-shipment inspection. Sampling inspection to an agreed plan, photos, measured values, packaging check.
  7. Shipping and import. Sea, rail or air freight; customs clearance in the EU with tariff code and EORI number.

What the costs are made of

  • One-off costs: tool or mould, fixtures, programming, first articles.
  • Unit costs: material, machine time, post-processing, finish, packaging.
  • Quality costs: inspections, measurement reports, material certificates.
  • Logistics: freight, insurance, clearance.
  • Import duties: customs duty depending on the tariff code, plus import VAT (deductible as input tax). In Germany you find the current duty rate in the Electronic Customs Tariff (EZT-online); EU-wide in TARIC.

Always compare quotes on the basis of the total cost delivered to your warehouse (landed cost), not just the unit price.

The five most common risks – and how to safeguard against them

Risk Safeguard
Parts do not match the drawing Unambiguous drawing, first article inspection report, approval before series
Quality varies during the series Defined inspection plan, pre-shipment inspection by our own team on site
Communication and misunderstandings One fixed contact person, specification in writing in English or German
Drawings reach third parties Non-disclosure agreement, passed on only to the selected factory
Unclear contractual partner Check the company register extract (CR number in Hong Kong, Unified Social Credit Code in mainland China)

Direct to the factory, platform or manufacturing partner?

  • Direct to the factory: lowest price, but you take on supplier search, communication and quality control yourself.
  • Online platform: fast instant quotes for standard parts, little personal support for complex parts.
  • Manufacturing partner with a team on site: one contact person, choice of the right factory for each process, control on site – sensible for castings, tooling and series.

Frequently asked questions

Do I need a 3D model? For a reliable quote, yes (STEP). For a first assessment a dimensioned drawing or a sample part is often enough.

Who owns the tool? The contract decides. Agree ownership, marking, service life and release in writing.

How long does a project take? That depends mainly on tool making and the transport route. Have tool making, sampling phase, series production and transport shown separately in the quote.

How do I recognise a reputable partner? A registered company with a verifiable registration number, real photos from the factories, willingness to provide first articles with a measurement report and to sign a non-disclosure agreement.


Do you have a drawing? Upload it – we check feasibility, process and cost.

Your drawing.
Our quote.

Upload STEP or PDF – you receive feasibility, process, tooling cost, unit price and lead time.

Upload a drawing
  • Quote with DFM notes – non-binding
  • NDA before the first exchange
  • First articles with measurement report