Short answer: A first article inspection report (FAIR, also ISIR; in German EMPB) documents that samples from the series process meet every characteristic of your drawing and specification. It usually consists of a cover sheet and result sheets with the measured values. With suppliers from China it is the most important safeguard before series start – agree on scope, number of samples and format already in your request.

What belongs in a first article inspection report?

Component Content
Cover sheet Part number, drawing revision, supplier, reason for sampling, result
Dimensional report Every dimension on the drawing with nominal, tolerance and actual value per sample
Material Material evidence, e.g. inspection certificate to EN 10204
Function Results of agreed functional or assembly tests
Surface Coating thickness, adhesion, appearance as agreed
Deviations Clearly marked, with the customer’s concession

In the automotive industry, sampling follows VDA Volume 2 (PPF) or the AIAG PPAP process. Which documents you actually require is set by your own specifications.

First-article sampling with a factory in China, step by step

  1. Define the inspection scope. Which characteristics, how many samples, which report format (your form, VDA or PPAP).
  2. Drawing with characteristic numbers. Number the dimensions on the drawing (“ballooning”) so that report and drawing match unambiguously.
  3. Samples from the series process. With series tooling, series material and series parameters – no hand-made samples.
  4. Measurement and report by the supplier, ideally cross-checked by an independent team on site.
  5. Shipping the samples together with the report; samples clearly labelled.
  6. Your incoming inspection of selected characteristics.
  7. Approval, conditional approval or rejection – in writing. Only then does the series start.

Typical mistakes – and how to avoid them

  • The report only says “OK” instead of measured values. Require actual values per sample and characteristic.
  • Samples from a different process than the series. Write “samples from series tooling and series process” into the order.
  • Wrong drawing revision. Compare the drawing index on the cover sheet and the order.
  • General tolerances missing. Without a reference (e.g. ISO 2768-m) it is unclear what is being measured against.
  • Language misunderstandings. Number the characteristics and define terms bilingually (German/English).

Frequently asked questions

How many first-article samples are usual? The customer decides. Guidelines of large manufacturers often specify several samples per cavity; agree on the number explicitly.

What is the difference between EMPB, ISIR and FAIR? In essence they mean the same thing: documented proof that the first series parts meet the requirements. The terms come from different industries and language areas.

Does every dimension have to be measured? For a full sampling, usually yes. For re-sampling after changes a reduced scope can be agreed.

Who pays for the first articles? That is a matter of negotiation. Clarify the costs for samples, measurement and any re-sampling in the quote.


First articles with a complete measurement report are part of every series project at Schutawill. Request a project

Further reading: VDA Volume 2 “Quality assurance of supplies” (VDA QMC); sampling guidelines of large German manufacturers.

Your drawing.
Our quote.

Upload STEP or PDF – you receive feasibility, process, tooling cost, unit price and lead time.

Upload a drawing
  • Quote with DFM notes – non-binding
  • NDA before the first exchange
  • First articles with measurement report